8 Errol Street (Temporary Works) – Allenbuild
May, 2017
VEDA have been appointed by Allenbuild to act as temporary works designer for a £15M scheme for the redevelopment at 8 Errol Street Temporary Works. The project involves the demolition of the existing 5 story concrete frame with the construction of new contiguous piled wall, basement and 8 floor reinforced construction frame.